http://www.powerint.com/en/events
The second event listed (LED China) actually goes from Feb 28 to Mar 3 and is entered into the CMS with those start and end dates. However, as you can see, only the beginning date is showing. The only thing unique about this is event is that it spans two months. I'm pretty sure that's what's causing the hiccup. I tried using a different date range and the problem went away.
I've searched through drupal.org but can't find any reference to the problem. Is this a known bug?
| Comment | File | Size | Author |
|---|---|---|---|
| drupal_datebug_1.gif | 15.76 KB | athanasius |
Comments
Comment #1
dturover commentedThis seems to be a v5 problem since I could not reproduce it on my v6 site. I hope that helps to track it down.
Comment #2
japerryEvent for Drupal 8 is unrelated to older versions. If an issue similar to this one exists, please open a new issue with the 8.x branch.