Maximum allowed expiry date value is 1 day off
ck9 - June 25, 2009 - 01:19
| Project: | Node Expire |
| Version: | 6.x-2.03 |
| Component: | Code |
| Category: | bug report |
| Priority: | normal |
| Assigned: | Unassigned |
| Status: | active |
Description
I've set both default and maximum expiry dates to +60 day. The user can not create the node if a date +60 days is set. The penultimate day is permitted however (i.e. 59 days later). If it makes any difference I was doing this at 2am.
e.g. if the maximum date allows values up to and including July 4. If the user selects July 4 as the expiry date then it will be rejected. July 3 is accepted. This is not expected as the JQuery UI allows July 4 to be selected.