Matrix calculation sum only takes last row

emilyf - August 25, 2009 - 17:28
Project:Matrix Field
Version:6.x-2.x-dev
Component:Code
Category:bug report
Priority:normal
Assigned:Unassigned
Status:active
Description

The calculation element is not working right. It only takes the last row as its sum (when using sum). In attached screenshot, the last row (Total, ALL, first run...) is a calculation sum.

AttachmentSize
Picture 2.png24.31 KB

#1

oemb29 - October 28, 2009 - 18:59

I have the same problem but with average:

GDP Vital Competences:
GDP Vital Competences GDP Complementary Competences GDP Generic Competences
1
3 2 4
2
3 2 5
3
3 2 6
4
- - -
5
- - -
6
- - -
7
- - -
8
- - -
9
- - -
10
- - -
Average
0.27 0.18 0.36

 
 