Support for Drupal 7 is ending on 5 January 2025—it’s time to migrate to Drupal 10! Learn about the many benefits of Drupal 10 and find migration tools in our resource center.
Downloads
Download scheduler-6.x-1.6.tar.gztar.gz
25.42 KB
MD5: 62c7956bbae110ff6e3a7ef694924f41
SHA-1: d0f48b464135d0dd572e8c67a8eaf1c1578fa43f
SHA-256: a3f9d3a9d17573416a40d6bd313486bc5ffdccf70750c89848b01b6d605c8e92
Download scheduler-6.x-1.6.zipzip
36.3 KB
MD5: 4ea31175e83d8c3b1928ce60394a65ae
SHA-1: 53ee31f61fe00bce66436541f2a943852bc5d8ea
SHA-256: deb35531b202a06e97ec9b3de1344ed710709288cdcbe1d157cdd9030b866eac
Release notes
- The jQuery popup calendar from the Date Popup module has been integrated for easy date and time selection (needs the Date Popup which is part of the Date module).
- Scheduler has been integrated with CCK. The scheduler field groups position can now be changed in the content types "manage fields" tab.
- Bug fix: The time and date for scheduled unpublishing of a node was not advertised correctly to the google bot.
- More date format characters are now supported.