Hi,
I have created a project branches on GIT and followed the drupal guidelines for tagging. The branches include the project releases for Drupal 6 and Drupal 7 versions. I can only see the 6.x-1.x version (default branch) in the Version Control tab, and the commit history only displays the commits to 6.x-1.x branch despite the commits are made to the 7.x-1.x branch.

The actions are visible when viewed in the Repository Viewer link of my project page with both the branches (6.x-1.x and 7.x-1.x) with tagging and also able to reclone both the branches, but not visible in the Version Control tab in my drupal account. Due to which, I am not able to release the stable versions of my project.

Please look into this issue. Thanks in advance.

Comments

drumm’s picture

Status: Active » Postponed (maintainer needs more info)

Which project is this?

th_tushar’s picture

Status: Postponed (maintainer needs more info) » Active

The URL of the project is Credit Card on Delivery for Ubercart

drumm’s picture

Assigned: Unassigned » drumm
Status: Active » Fixed

I resynced the repository. Both branches are now available.

th_tushar’s picture

Hi @drumm,
Thank you for the support, the branches are now available in version control tab.

Status: Fixed » Closed (fixed)

Automatically closed - issue fixed for 2 weeks with no activity.